Paper |
Title |
Page |
MOPLXGD1 |
The SuperKEKB Has Broken the World Record of the Luminosity |
1 |
|
- Y. Funakoshi, T. Abe, K. Akai, Y. Arimoto, K. Egawa, S. Enomoto, H. Fukuma, K. Furukawa, N. Iida, H. Ikeda, T. Ishibashi, S.H. Iwabuchi, H. Kaji, T. Kamitani, T. Kawamoto, M. Kikuchi, T. Kobayashi, K. Kodama, H. Koiso, M. Masuzawa, K. Matsuoka, T. Mimashi, G. Mitsuka, F. Miyahara, T. Miyajima, T. Mori, A. Morita, S. Nakamura, T.T. Nakamura, K. Nakanishi, H.N. Nakayama, M. Nishiwaki, S. Ogasawara, K. Ohmi, Y. Ohnishi, N. Ohuchi, T. Okada, T. Oki, M.A. Rehman, Y. Seimiya, K. Shibata, Y. Suetsugu, H. Sugimoto, H. Sugimura, M. Tawada, S. Terui, M. Tobiyama, R. Ueki, X. Wang, K. Watanabe, S.I. Yoshimoto, T. Yoshimoto, D. Zhou, X. Zhou, Z.G. Zong
KEK, Ibaraki, Japan
- A. Natochii
University of Hawaii, Honolulu,, USA
- K. Oide
CERN, Meyrin, Switzerland
- R.J. Yang
CAEP/IAE, Mianyang, Sichuan, People’s Republic of China
- K. Yoshihara
Nagoya University, Nagoya, Aichi, Japan
|
|
|
The SuperKEKB broke the world record of the luminosity in June 2020 in the Phase 3 operation. The luminosity has been increasing since then and the present highest luminosity is 4.65 x 1034 cm-2s-1 with βy* of 1 mm. The increase of the luminosity was brought with an application of crab waist, by increasing beam currents and by other improvements in the specific luminosity. In this paper, we describe what we have achieved and what we are struggling with. Finally, we mention a future plan briefly.
|
|
|
Slides MOPLXGD1 [6.235 MB]
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2022-MOPLXGD1
|
|
About • |
Received ※ 10 June 2022 — Accepted ※ 08 July 2022 — Issue date ※ 10 July 2022 |
|
Cite • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
THPOST012 |
Achievement of 200, 000 Hours of Operation at KEK 7-GeV Electron 4-GeV Positron Injector Linac |
2465 |
|
- K. Furukawa, M. Akemoto, D.A. Arakawa, Y. Arakida, H. Ego, Y. Enomoto, T. Higo, H. Honma, N. Iida, K. Kakihara, T. Kamitani, H. Katagiri, M. Kawamura, S. Matsumoto, T. Matsumoto, H. Matsushita, K. Mikawa, T. Miura, F. Miyahara, H. Nakajima, T. Natsui, Y. Ogawa, S. Ohsawa, Y. Okayasu, T. Oogoe, M.A. Rehman, I. Satake, M. Satoh, Y. Seimiya, T. Shidara, A. Shirakawa, H. Someya, T. Suwada, M. Tanaka, D. Wang, Y. Yano, K. Yokoyama, M. Yoshida, T. Yoshimoto, R. Zhang, X. Zhou
KEK, Ibaraki, Japan
- Y. Bando
Sokendai, Ibaraki, Japan
|
|
|
KEK electron positron injector linac initiated the injection operation into Photon Factory (PF) light source in 1982. Since then for 39 years, it has served for multiple projects, namely, TRISTAN, PF-AR, KEKB, and SuperKEKB. Its total operation time has accumulated 200 thousand hours on May 7, 2020. We are extremely proud of the achievement following continuous efforts by our seniors. The construction of the injector linac started in 1978, and it was commissioned for PF with 2.5 GeV electron in 1982. In parallel, the positron generator linac was constructed for the TRISTAN collider project. The slow positron facility was also commissioned in 1992. After the KEKB asymmetric-energy collider project was commissioned in 1998 with direct energy injections, the techniques such as two-bunch acceleration and simultaneous injection were developed. As the soft structure design of the linac was too weak against the great east Japan earthquake, it took three years to recover. Then the construction and commissioning for the SuperKEKB project went on, and the simultaneous top-up injection into four storage rings contributes to the both elementary particle physics and photon science.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2022-THPOST012
|
|
About • |
Received ※ 20 May 2022 — Revised ※ 15 June 2022 — Accepted ※ 16 June 2022 — Issue date ※ 08 July 2022 |
Cite • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|