Status of LASA-INFN R&D Activity on PIP-II Low-beta Prototypes |
1241 |
|
- M. Bertucci, A. Bosotti, A. D’Ambros, E. Del Core, A.T. Grimaldi, P. Michelato, L. Monaco, C. Pagani, R. Paparella, D. Sertore
INFN/LASA, Segrate (MI), Italy
- A. Gresele
Zanon Research & Innovation, Schio, VI, Italy
- C. Pagani
Università degli Studi di Milano & INFN, Segrate, Italy
|
|
|
LASA-INFN is developing some PIP-II β=0.61 cavity prototypes so to set up a high-Q recipe allowing to reach the PIP-II performance target in view of the series production. A single-cell cavity was treated with a XFEL-like baseline recipe, whereas a multicell cavity underwent a mid-T bake step as final surface treatment. Both cavities have been then tested at the LASA vertical experimental facility. The test results are here reported and discussed. Basing on the satisfactory results so far obtained, a strategy for the qualification and upgrade of the LASA vertical test facility is outlined.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2022-TUPOTK020
|
|
About • |
Received ※ 08 June 2022 — Revised ※ 13 June 2022 — Accepted ※ 14 June 2022 — Issue date ※ 16 June 2022 |
Cite • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
TUPOTK022 |
INFN-LASA for the Fermilab PIP-II |
1249 |
|
- R. Paparella, M. Bertucci, M. Bonezzi, A. Bosotti, D. Cardelli, A. D’Ambros, E. Del Core, A.T. Grimaldi, L. Monaco, D. Sertore, G.M. Zaggia
INFN/LASA, Segrate (MI), Italy
- C. Pagani
Università degli Studi di Milano & INFN, Segrate, Italy
|
|
|
The status of INFN-LASA contribution to the PIP-II project at Fermilab is reported in this paper. Experimental results and ongoing activities on prototypes are summarized together with the development of related testing infrastructures. The series production of the 38 5-cell, beta 0.61 cavities designed by INFN-LASA for the LB650 section of the PIP-II linac recently commenced, the status of major procurements and associated activities is here below presented. All cavities will be produced and surface treated in industry to reach the unprecedented performances required, qualified through vertical cold test at qualified infrastructures and delivered as linac-ready at the string assembly site.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2022-TUPOTK022
|
|
About • |
Received ※ 09 June 2022 — Revised ※ 10 June 2022 — Accepted ※ 16 June 2022 — Issue date ※ 04 July 2022 |
Cite • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|