Author: Choi, Y.
Paper Title Page
MOPOTK039 Iron Yoke Effects in Quadrupole Magnets for High Rigidity Isotope Beams 546
SUSPMF057   use link to see paper's listing under its alternate paper code  
 
  • D.B. Greene, Y. Choi, J. DeKamp, P.N. Ostroumov, M. Portillo, J.D. Wenstrom, T. Xu
    FRIB, East Lansing, Michigan, USA
  • S.L. Manikonda
    AML, Melbourne, Florida, USA
 
  Iron-dominated superconducting magnets are one of the most popular and most used design choices for superconducting magnetic quadrupoles for accelerator systems. While the iron yoke and pole tips are economic and effective in shaping the field, the large amount of iron also leads to certain drawbacks, namely, unwanted harmonics from the sextupole correctors nested inside of the quadrupole. Additional problems include the nonlinear field profile present in the high-field regime engendered by the presence of steel, and the mechanical and cryogenic design challenges of the entire iron yoke being part of the cold mass. The presented work discusses these effects and challenges by comparing an iron-dominated quadrupole model to an equivalent coil-dominated quadrupole model. The comparison of their respective magnetic harmonics, integrated strength, multipole effects, and mechanical challenges demonstrates that the coil-dominated design is a more favorable choice for select accelerator systems.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2022-MOPOTK039  
About • Received ※ 08 June 2022 — Revised ※ 11 June 2022 — Accepted ※ 12 June 2022 — Issue date ※ 03 July 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUIYGD3 FRIB Commissioning and Early Operations 802
 
  • J. Wei, H. Ao, S. Beher, G. Bollen, N.K. Bultman, F. Casagrande, W. Chang, Y. Choi, S. Cogan, C. Compton, M. Cortesi, J.C. Curtin, K.D. Davidson, X.-J. Du, K. Elliott, B. Ewert, A. Facco, A. Fila, K. Fukushima, V. Ganni, A. Ganshyn, T. Glasmacher, J.-W. Guo, Y. Hao, W. Hartung, N.M. Hasan, M. Hausmann, K. Holland, H.-C. Hseuh, M. Ikegami, D.D. Jager, S. Jones, N. Joseph, T. Kanemura, S.H. Kim, C. Knowles, P. Knudsen, T. Konomi, B.R. Kortum, T. Lange, M. Larmann, T.L. Larter, K. Laturkar, R.E. Laxdal, J. LeTourneau, Z. Li, S.M. Lidia, G. Machicoane, C. Magsig, P.E. Manwiller, F. Marti, T. Maruta, E.S. Metzgar, S.J. Miller, Y. Momozaki, D.G. Morris, M. Mugerian, I.N. Nesterenko, C. Nguyen, P.N. Ostroumov, M.S. Patil, A.S. Plastun, J.T. Popielarski, L. Popielarski, M. Portillo, J. Priller, X. Rao, M.A. Reaume, H.T. Ren, K. Saito, B.M. Sherrill, A. Stolz, B.P. Tousignant, R. Walker, X. Wang, J.D. Wenstrom, G. West, K. Witgen, M. Wright, T. Xu, T. Xu, Y. Yamazaki, T. Zhang, Q. Zhao, S. Zhao
    FRIB, East Lansing, Michigan, USA
  • B. Arend, T.N. Ginter, E. Kwan, M.K. Smith, M. Steiner, O. Tarasov
    NSCL, East Lansing, Michigan, USA
  • A. Facco
    INFN/LNL, Legnaro (PD), Italy
  • K. Hosoyama
    KEK, Ibaraki, Japan
  • M.P. Kelly, Y. Momozaki
    ANL, Lemont, Illinois, USA
  • R.E. Laxdal
    TRIUMF, Vancouver, Canada
  • M. Wiseman
    JLab, Newport News, Virginia, USA
 
  Funding: Work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC0000661.
The Facility for Rare Isotope Beams (FRIB) project has completed technical construction in January 2022, five months ahead of schedule baselined about 10 years ago. Beam commissioning has been planned in seven phases starting from 2017 when the normal-conducting ion source and RFQ were commissioned. In April 2021, FRIB driver linac commissioning was completed with heavy ion beams being accelerated to energies above 200 MeV/u using 324 superconducting radiofrequency (SRF) resonators contained in 46 cryomodules. In preparation for high-power operations, a liquid lithium charge strip-per was used to strip uranium beam from average charge state of 33+ to 78+, and multiple charge states were accelerated simultaneously in the linac. By January 2022, FRIB target and fragment separator commissioning was completed with rare-isotope beams produced and identified. In May 2022, the first FRIB user scientific experiment was successfully conducted. This talk summarizes the FRIB accelerator project commissioning and early operations experience with discussions on strategic planning, operational envelope conformance, technical risk mitigation, and lessons learned.
 
slides icon Slides TUIYGD3 [23.483 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2022-TUIYGD3  
About • Received ※ 07 June 2022 — Revised ※ 10 June 2022 — Accepted ※ 17 June 2022 — Issue date ※ 06 July 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)