Author: Carli, C.
Paper Title Page
MOPOTK031 10 TeV Center of Mass Energy Muon Collider 515
 
  • K. Skoufaris, C. Carli, D. Schulte
    CERN, Meyrin, Switzerland
 
  A Muon collider can provide unique opportunities in high-energy physics as an energy frontier machine. However, a number of challenges have to be addressed during the design process primarily due to the short lifetime of muons. In this work, a lattice for a §I10{TeV} center-of-mass energy collider is presented. Some of the more important challenges faced are: the design of an interaction region with β* values of the order of a few millimeters and an adequate chromatic compensation without sacrificing the physical and dynamic aperture, the flexibility to control the momentum compaction factor and the radiation generated where neutrinos from muons decays reach the surface. These issues are addressed with the development of a new chromatic correction scheme, the extensive use of flexible momentum compaction factor cells and the efficient control of the optical parameters.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2022-MOPOTK031  
About • Received ※ 03 June 2022 — Revised ※ 12 June 2022 — Accepted ※ 13 June 2022 — Issue date ※ 20 June 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPOST001 Radiation Load Studies for Superconducting Dipole Magnets in a 10 TeV Muon Collider 1671
 
  • D. Calzolari, C. Carli, B. Humann, A. Lechner, G. Lerner, F. Salvat Pujol, D. Schulte, K. Skoufaris
    CERN, Meyrin, Switzerland
  • B. Humann
    TU Vienna, Wien, Austria
 
  Among the various future lepton colliders under study, muon colliders offer the prospect of reaching the highest collision energies. Despite the promising potential of a multi-TeV muon collider, the short lifetime of muons poses a severe technological challenge for the collider design. In particular, the copious production of decay electrons and positrons along the collider ring requires the integration of continuous radiation absorbers inside superconducting magnets. The absorbers are needed to avoid quenches, reduce the heat dissipation in the cold mass and prevent magnet failures due to long-term radiation damage. In this paper, we present FLUKA shower simulations assessing the shielding requirements for high-field magnets of a 10 TeV muon collider. We quantify in particular the role of synchrotron photon emission by decay electrons and positrons, which helps in dispersing the energy carried by the decay products. For comparison, selected results for a 3 TeV muon collider are also presented.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2022-WEPOST001  
About • Received ※ 08 June 2022 — Revised ※ 11 June 2022 — Accepted ※ 14 June 2022 — Issue date ※ 16 June 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPOTK026 Commissioning of the ELENA Electrostatic Transfer Lines for the Antimatter Facility at CERN 2110
 
  • Y. Dutheil, W. Bartmann, C. Carli, M.A. Fraser, D. Gamba, L. Ponce
    CERN, Meyrin, Switzerland
 
  ELENA is a small synchrotron ring that decelerates antiprotons down to a kinetic energy of 100 keV. With an experimental complex capable of housing up to 9 different experiments operating simultaneously, the transfer line design needed to be highly flexible. The low energy of the beam transported allowed the exploitation of electrostatic devices instead of magnets, to simplify design, production and operation. This contribution presents the systematic characterisation of the beam optics at the different experimental handover locations during beam commissioning using H ions from an external source, as well as the performance of the lines in operation with antiprotons. Finally, the effect of stray fields created by the experimental setup will be presented and compared with the first measurements.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2022-WEPOTK026  
About • Received ※ 10 June 2022 — Accepted ※ 16 June 2022 — Issue date ※ 28 June 2022  
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THOXGD1 ELENA - From Commissioning to Operation 2391
 
  • L. Ponce, L. Bojtár, C. Carli, B. Dupuy, Y. Dutheil, P. Freyermuth, D. Gamba, L.V. Jørgensen, B. Lefort, S. Pasinelli
    CERN, Meyrin, Switzerland
 
  In 2021 the Extra Low ENergy Antiproton ring (ELENA) moved from commissioning into the physics production phase providing 100 keV antiprotons to the newly connected experiments paving the way to an improved trapping efficiency by one to two orders of magnitude compared to the AD era. After recalling the major work undertaken during the CERN Long Shutdown 2 (2019-2020) in the antiproton deceleration complex, details will be given on the ELENA ring and the new electrostatic transfer line beam commissioning using an ion source. Sub-sequentially, the progress from commissioning with ions to operation with antiprotons will be described with emphasis on the achieved beam performance. Finally, the impact on the performance of the main hardware systems will be reviewed.  
slides icon Slides THOXGD1 [9.720 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2022-THOXGD1  
About • Received ※ 07 June 2022 — Revised ※ 15 June 2022 — Accepted ※ 15 June 2022 — Issue date ※ 01 July 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)