Author: Bracco, C.
Paper Title Page
MOPOST057 Characterization of the Vertical Beam Tails in the CERN PS Booster 218
 
  • T. Prebibaj, F. Antoniou, F. Asvesta, H. Bartosik, C. Bracco, G.P. Di Giovanni, E. Renner
    CERN, Meyrin, Switzerland
 
  The CERN Proton Synchrotron Booster (PSB) went through major upgrades in the framework of the LHC Injectors Upgrade Project (LIU) aiming to double the brightness of the LHC beams. Operation restarted in early 2021, demonstrating the expected performance improvement. The high-brightness beams, nevertheless, appear to have overpopulated tails in the vertical beam profiles, both at injection and at extraction energies. In an attempt to understand the origin and evolution of the observed tails, systematic profile measurements were performed for different machine and beam configurations using Wire Scanners (WS). The results are presented in this report and compared to simulations. The effect of the Coulomb scattering of the wire to the beam distribution is also addressed.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2022-MOPOST057  
About • Received ※ 03 June 2022 — Revised ※ 16 June 2022 — Accepted ※ 17 June 2022 — Issue date ※ 24 June 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEIYGD1 Achievements and Performance Prospects of the Upgraded LHC Injectors 1610
 
  • V. Kain, S.C.P. Albright, R. Alemany-Fernández, M.E. Angoletta, F. Antoniou, T. Argyropoulos, F. Asvesta, B. Balhan, M.J. Barnes, D. Barrientos, H. Bartosik, P. Baudrenghien, G. Bellodi, N. Biancacci, A. Boccardi, J.C.C.M. Borburgh, C. Bracco, E. Carlier, D.G. Cotte, J. Coupard, H. Damerau, G.P. Di Giovanni, A. Findlay, M.A. Fraser, A. Funken, B. Goddard, G. Hagmann, K. Hanke, A. Huschauer, M. Jaussi, I. Karpov, T. Koevener, D. Küchler, J.-B. Lallement, A. Lasheen, T.E. Levens, K.S.B. Li, A.M. Lombardi, N. Madysa, E. Mahner, M. Meddahi, L. Mether, B. Mikulec, J.C. Molendijk, E. Montesinos, D. Nisbet, F.-X. Nuiry, G. Papotti, K. Paraschou, F. Pedrosa, T. Prebibaj, S. Prodon, D. Quartullo, E. Renner, F. Roncarolo, G. Rumolo, B. Salvant, M. Schenk, R. Scrivens, E.N. Shaposhnikova, P.K. Skowroński, A. Spierer, F. Tecker, D. Valuch, F.M. Velotti, R. Wegner, C. Zannini
    CERN, Meyrin, Switzerland
 
  To provide HL-LHC performance, the CERN LHC injector chain underwent a major upgrade during an almost 2-year-long shutdown. In the first half of 2021 the injectors were gradually re-started with the aim to reach at least pre-shutdown parameters for LHC as well as for fixed target beams. The strategy of the commissioning across the complex, a summary of the many challenges and finally the achievements will be presented. Several lessons were learned and have been integrated to define the strategy for the performance ramp-up over the coming years. Remaining limitations and prospects for LHC beam parameters at the exit of the LHC injector chain in the years to come will be discussed. Finally, the emerging need for improved operability of the CERN complex will be addressed, with a description of the first efforts to meet the availability and flexibility requirements of the HL-LHC era while at the same time maximizing fixed target physics output.  
slides icon Slides WEIYGD1 [5.905 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2022-WEIYGD1  
About • Received ※ 08 June 2022 — Accepted ※ 15 June 2022 — Issue date ※ 09 July 2022  
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPOST014 Studies on Pre-Computation of SPS-to-LHC Transfer Line Corrections 1711
 
  • C. Bracco, F.M. Velotti
    CERN, Meyrin, Switzerland
 
  The injection process in the LHC gives a non-negligible contribution to the turnaround time between two consecutive physics fills. Mainly due to orbit drifts in the SPS, the steering of the SPS-to-LHC transfer lines (TL) had to be regularly performed in view of minimising injection oscillations and losses, which otherwise would trigger beam dumps. Moreover, for machine protection purposes, a maximum of twelve bunches had to be injected after any TL steering to validate the actual applied corrections. This implied at several occasions the need to interrupt a fill to steer the lines and introduced a further delay between fills. Studies were performed to evaluate the option of pre-calculating the required TL corrections based on SPS orbit measurements during the LHC magnet ramp down and the reconstruction of the beam position and angle at the SPS extraction point.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2022-WEPOST014  
About • Received ※ 06 June 2022 — Revised ※ 14 June 2022 — Accepted ※ 14 June 2022 — Issue date ※ 16 June 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPOTK011 High Intensity Studies in the CERN Proton Synchrotron Booster 2056
 
  • F. Asvesta, S.C.P. Albright, F. Antoniou, H. Bartosik, C. Bracco, G.P. Di Giovanni, G. Rumolo, P.K. Skowroński, C. Zannini
    CERN, Meyrin, Switzerland
  • E. Renner
    TU Vienna, Wien, Austria
 
  After the successful implementation of the LHC Injectors Upgrade (LIU) project, studies were conducted in the CERN Proton Synchrotron Booster (PSB) in order to assess the intensity reach with the increased beam brightness. The studies focused on the high intensity beams delivered to the PSB users, both at 1.4 and 2 GeV. In addition, possible intensity limitations in view of the Physics Beyond Colliders (PBC) Study were investigated. To this end, various machine configurations were tested including different resonance compensation schemes and chromaticity settings in correlation with the longitudinal parameters. This paper summarizes the results obtained since the machine recommissioning.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2022-WEPOTK011  
About • Received ※ 05 June 2022 — Revised ※ 13 June 2022 — Accepted ※ 14 June 2022 — Issue date ※ 19 June 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)