THPOTK019 |
Collider NICA Power Supply Magnet System |
2806 |
|
- V. Karpinsky, R.M. Ahmadrizyalov, S.A. Arefev, A.V. Butenko, A.V. Karavaev, S.V. Kirov, A.V. Kopchenov, A.A. Kozlykovskaya, T.A. Kulaeva, A.L. Osipenkov, A.V. Sergeev, A.A. Shurygin, E. Syresin, V.G. Tovstuha, N.V. Travin
JINR, Dubna, Moscow Region, Russia
- M.I. Kuznetsov
JINR/VBLHEP, Dubna, Moscow region, Russia
|
|
|
A power supply system for Collider structural magnets is considered, which consists of precision current sources, energy evacuation devices for superconducting elements, additional sources, and control and monitoring equipment. The status of the equipment and the plan of its placement in Collider bld. 17 are presented.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2022-THPOTK019
|
|
About • |
Received ※ 02 June 2022 — Accepted ※ 16 June 2022 — Issue date ※ 07 July 2022 |
|
Cite • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
THPOTK020 |
Recent Experience from the Large-Scale Deployment of Power Converters with Magnet Energy Recovery |
2809 |
|
- K.D. Papastergiou, G. Le Godec, V. Montabonnet
CERN, Meyrin, Switzerland
|
|
|
A new powering solution was deployed at CERN for transfer lines in the injector complex as part of the LHC injectors upgrade. The new powering uses regenerative power converters to recycle the magnet energy between physics operations. This work gives an overview of the developed technology, the way it is used in the accelerators complex and some results of first period of operation with beam.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2022-THPOTK020
|
|
About • |
Received ※ 03 June 2022 — Revised ※ 11 June 2022 — Accepted ※ 25 June 2022 — Issue date ※ 28 June 2022 |
Cite • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|