WEPOTK024 Upgrade of Septum Magnets for Fast Extraction in J-Parc Main Ring 2103
 
  • S. Iwata, K. Ishii, H. Matsumoto, N. Matsumoto, Y. Sato, T. Shibata, T. Sugimoto, M. Uota
    KEK, Ibaraki, Japan
 
  We aim to supply a high-power proton beam of 1.3 MW to the neutrino facility from J-PARC Main Ring (MR) by shortening the repetition cycle to 1.16 s from 2.48 s and increasing the number of particles by 30%. The six sep-tum magnets for fast extraction (FX) need to be replaced to reduce the heat that is generated as a result of shorten-ing the repetition cycle. The replacement of the septum magnets began in July 2021 and was completed at the end of May 2022. The beam commissioning starts in June 2022. We report the details of the replacement work and operation test of the new septum magnets. We found a defect in the magnetic coil of the septum (SM32) in August 2021. We decided to postpone its installation to around August 2022 and produce new magnet coils for the SM32. The beam extraction in June 2022 will be per-formed using a temporary vacuum duct instead of the SM32 magnet, and the extraction beam orbit will be maintained by increasing the magnetic field of the other five septum magnets.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2022-WEPOTK024  
About • Received ※ 08 June 2022 — Revised ※ 10 June 2022 — Accepted ※ 16 June 2022 — Issue date ※ 10 July 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)