Author: Thomas, C.A.
Paper Title Page
WEPOTK001 Status of the Normal Conducting Linac at the European Spallation Source 2019
 
  • D.C. Plostinar, C. Amstutz, S. Armanet, R.A. Baron, E.C. Bergman, A.K. Bhattacharyya, B.E. Bolling, W. Borg, S. Calic, M. Carroll, J. Cereijo García, J. Christensson, J.D. Christie, H. Danared, C.S. Derrez, E.M. Donegani, S. Ekström, M. Eriksson, M. Eshraqi, J.F. Esteban Müller, K. Falkland, M.J. Ferreira, A. Forsat, S. Gabourin, A.A. Gorzawski, V. Grishin, P.O. Gustavsson, S. Haghtalab, V.A. Harahap, H. Hassanzadegan, W. Hees, J.J. Jamróz, A. Jansson, M. Jensen, B. Jones, M. Kalafatic, I. Kittelmann, H. Kocevar, S. Kövecses de Carvalho, E. Laface, B. Lagoguez, Y. Levinsen, M. Lindroos, A. Lundmark, M. Mansouri, C. Marrelli, C.A. Martins, J.P.S. Martins, S. Micic, N. Milas, R. Miyamoto, M. Mohammednezhad, R. Montaño, M. Muñoz, G. Mörk, D.J.P. Nicosia, B. Nilsson, D. Noll, A. Nordt, T. Olsson, L. Page, D. Paulic, S. Pavinato, S. Payandeh Azad, A. Petrushenko, J. Riegert, A. Rizzo, K.E. Rosengren, K. Rosquist, M. Serluca, T.J. Shea, A. Simelio, S. Slettebak, A.G. Sosa, H. Spoelstra, A.M. Svensson, L. Svensson, R. Tarkeshian, L. Tchelidze, C.A. Thomas, E. Trachanas, K. Vestin, R. Zeng, P.L. van Velze, N. Öst
    ESS, Lund, Sweden
  • L. Antoniazzi, C. Baltador, L. Bellan, M. Comunian, E. Fagotti, L. Ferrari, M.G. Giacchini, F. Grespan, M. Montis, A. Palmieri, A. Pisent, D. Scarpa
    INFN/LNL, Legnaro (PD), Italy
  • T. Bencivenga, P. Mereu, C. Mingioni, M. Nenni, E. Nicoletti
    INFN-Torino, Torino, Italy
  • I. Bustinduy, A. Conde, D. Fernández-Cañoto, N. Garmendia, P.J. González, G. Harper, A. Kaftoosian, J. Martin, I. Mazkiaran, J.L. Muñoz, A.R. Páramo, S. Varnasseri, A.Z. Zugazaga
    ESS Bilbao, Derio, Spain
  • A.C. Chauveau, P. Hamel, O. Piquet
    CEA-IRFU, Gif-sur-Yvette, France
  • L. Neri
    INFN/LNS, Catania, Italy
 
  The construction of the ESS accelerator is in full swing. Many key components have been delivered from our in-kind partners and installation, testing and commissioning is making remarkable progress. The first machine section to be commissioned with beam is the Normal Conducting Linac (NCL). When completed, a 14 Hz, 2.86 ms proton beam up to 62.5 mA will be transported from the Ion Source, through the Low Energy Beam Transport (LEBT) line, the Radiofrequency Quadrupole (RFQ), the Medium Energy Beam Transport (MEBT) line and the five Drift Tube Linac (DTL) tanks up to 90 MeV where it will be injected in the first superconducting module of the machine. This paper will highlight recent progress across the NCL, present briefly the first commissioning results and discuss the upcoming phases as well as challenges in delivering a machine capable of meeting the requirements for a next generation spallation neutron facility.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2022-WEPOTK001  
About • Received ※ 13 June 2022 — Accepted ※ 15 June 2022 — Issue date ※ 02 July 2022  
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)