Author: Ries, M.
Paper Title Page
TUPOMS028 3HC - Third Harmonic Normal Conducting Active Cavity Collaboration Between HZB, DESY and ALBA 1471
 
  • F. Pérez, J.R. Ocampo, A. Salom, P. Solans
    ALBA-CELLS Synchrotron, Cerdanyola del Vallès, Spain
  • W. Anders, V. Dürr, T. Loewner, A.N. Matveenko, M. Ries, L. Shi, Y. Tamashevich, A.V. Tsakanian
    HZB, Berlin, Germany
  • M. Ebert, R. Onken
    DESY, Hamburg, Germany
  • P. Hülsmann
    GSI, Darmstadt, Germany
  • W.F.O. Müller
    TEMF, TU Darmstadt, Darmstadt, Germany
 
  Funding: Co-funded by the European Regional Development Fund (ERDF)
A collaboration agreement between the HZB, DESY and ALBA institutions was signed on 2021 in order to test the 3rd harmonic normal conducting, HOM damped, active cavity designed and prototyped by ALBA*. The test will involve low power characterization of the fundamental mode, bead pull measurements to fully determine the HOM characteristics, a full high power conditioning to validate the power capability of the cavity, and finally, the installation of the cavity in the BESSY II storage ring in order to test the cavity in real conditions with beam. In this paper the low power, bead pull and conditioning results will be presented. The cavity has been installed at BESSY II on May 2022 to be tested after the summer shutdown.
* Prototype fabrication of an active normal conducting third harmonic cavity for the ALBA Storage Ring. J.Ocampo et al. , IPAC 2022 proceedings.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2022-TUPOMS028  
About • Received ※ 06 June 2022 — Revised ※ 12 June 2022 — Accepted ※ 13 June 2022 — Issue date ※ 02 July 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPOST025 Operational Experience with the Improved VSR DEMO Collimating Shielded Bellow in BESSY II 2497
 
  • H.-W. Glock, V. Dürr, F. Glöckner, J. Knobloch, M. Ries, A. Vélez
    HZB, Berlin, Germany
  • J. Knobloch
    University of Siegen, Siegen, Germany
  • A. Vélez
    Technical University Dortmund, Dortmund, Germany
 
  Funding: Work supported by grants of the Helmholtz Association
The Collimating Shielded Bellow (CsB) is designed to serve both as a flexible beam pipe connection between two adjacent superconducting cavities as foreseen in VSR DEMO and as a synchrotron light collimator to shield the down-stream cavity from synchrotron radiation. A convoluted inner RF shield was applied to prevent fundamental mode heating of the stainless-steel-made bellow in the cryogenic environment, making the such captured inner volume very difficult to access for inspection and cleaning. A first version of the device was successfully tested as part of the beam pipe of the synchrotron light source BESSY II under regular operation for more than a year. It suffered from an unfavorable long outgassing commissioning. Therefore a detachable design, allowing for rigorous inner surface preparation and cleaning, was built and recently installed in BESSY II. CsB version 2 design and experimental outcomes are described in the paper. First results indicated a significantly improved vacuum commissioning performance, which was confirmed later on.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2022-THPOST025  
About • Received ※ 14 June 2022 — Accepted ※ 16 June 2022 — Issue date ※ 10 July 2022  
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)