TUPOST008 Digital Low-Level RF System for the CERN Linac3 Accelerator 853
 
  • D. Valuch, R. Alemany-Fernández, Y. Brischetto, S.J. Faeroe, G. Piccinini, M.E. Soderen
    CERN, Meyrin, Switzerland
 
  A major consolidation of the aging RF system of the CERN Linac3, the ion source for the whole CERN accelerator chain, started during the Long Shutdown II. The main changes were an upgrade of the analogue Low-Level RF system (LLRF) and replacement of the 350 kW tube amplifiers by a solid-state equivalent. The state-of-the-art digital LLRF system enabled new sophisticated features in field manipulations, significantly increased the operational flexibility and improved operational reliability and availability. The paper presents the new architecture, a low noise master clock generator, digital signal processing with direct sampling of the RF signals, pulse parameter measurement or cavity resonance control.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2022-TUPOST008  
About • Received ※ 27 May 2022 — Revised ※ 13 June 2022 — Accepted ※ 15 June 2022 — Issue date ※ 15 June 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPOPT055 Linac3, LEIR and PS Performance with Ions in 2021 and Prospects for 2022 1983
 
  • N. Biancacci, S.C.P. Albright, R. Alemany-Fernández, D. Alves, M.E. Angoletta, D. Barrientos, H. Bartosik, G. Bellodi, S.B. Bertolo, D. Bodart, M. Bozzolan, H. Damerau, F.D.L. Di Lorenzo, A. Frassier, D. Gamba, A. Huschauer, S. Jensen, V. Kain, T. Koevener, G. Kotzian, D. Küchler, A. Lasheen, G. Le Godec, T.E. Levens, N. Madysa, E. Mahner, O. Marqversen, C.M. Mastrostefano, P.D. Meruga, C. Mutin, M. O’Neil, G. Piccinini, R. Scrivens, P.S. Solvang, D. Valuch, F.M. Velotti, R. Wegner, C. Wetton, M. Zampetakis
    CERN, Meyrin, Switzerland
 
  CERN accelerators underwent a period of long shutdown from the end of 2018 to 2020. During this time frame, significant hardware and software upgrades have been put in place to increase the performance of both proton and ion accelerator chains in the High Luminosity LHC era. In the context of the CERN lead ion chain, 2021 has been mainly devoted to restore the injectors’ performance and to successfully prove the slip-stacking technique in SPS. In this paper we summarise the key milestones of the ion beam commissioning and the achieved beam performance for the Linac 3 (including the source), LEIR and PS accelerators, together with an outlook on 2022 operation.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2022-WEPOPT055  
About • Received ※ 03 June 2022 — Revised ※ 12 June 2022 — Accepted ※ 16 June 2022 — Issue date ※ 17 June 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)