Author: Petree, M.
Paper Title Page
TUPOPT037 LCLS Multi-Bunch Improvement Plan: First Results 1092
 
  • A. Halavanau, A.L. Benwell, T.G. Beukers, L.B. Borzenets, F.-J. Decker, J. Hugyik, A. Ibrahimov, E.N. Jongewaard, A.K. Krasnykh, A.L. Le, K. Luchini, A.A. Lutman, A. Marinelli, M. Petree, A. Romero, A.V. Sy
    SLAC, Menlo Park, California, USA
 
  LCLS copper linac primarily operates in a single bunch mode with a repetition rate of 120 Hz. Presently, several in-house projects and LCLS user experiments require double- and multi-pulse trains of X-rays, with inter-pulse delay spanning between 0.35 and 220 ns. We discuss beam control improvements to the copper linac using ultra-fast stripline kicker, as well as additional photon diagnostics. We especially focus on a case of double-pulse mode, with 218 ns separation.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2022-TUPOPT037  
About • Received ※ 12 June 2022 — Revised ※ 13 June 2022 — Accepted ※ 17 June 2022 — Issue date ※ 10 July 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)