The Report of Machine Studies Related to the Vertical Beam Size Blow-Up in SuperKEKB LER |
2169 |
|
- S. Terui, H. Fukuma, Y. Funakoshi, T. Ishibashi, T. Nakamura, K. Ohmi, Y. Ohnishi, M. Tobiyama, R. Ueki
KEK, Ibaraki, Japan
|
|
|
In the Low Energy Ring (LER) for positrons in the SuperKEKB, a vertical beam size blow-up was observed when the bunch current was approximately 1 mA. If a beam size blow-up occurs, the design luminosity cannot be achieved. Therefore, beam size blow-ups must be pre-vented. According to calculations, the bunch current threshold of the Transverse Mode Coupling instability (TMCI) is 2 mA or more, and the observed value is 50% or smaller. This vertical beam size blow-up cannot be explained by ordinary TMCI. This paper shows that by analyzing factors such as beam oscillation, the cause of the vertical beam size blow-up was determined. The study results showed that the vertical beam size blow-up in the LER was caused by the oscillations of the -1 mode.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2022-WEPOTK050
|
|
About • |
Received ※ 17 May 2022 — Accepted ※ 22 June 2022 — Issue date ※ 25 June 2022 |
|
Cite • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|