Author: Nakamura, T.
Paper Title Page
WEPOTK050 The Report of Machine Studies Related to the Vertical Beam Size Blow-Up in SuperKEKB LER 2169
 
  • S. Terui, H. Fukuma, Y. Funakoshi, T. Ishibashi, T. Nakamura, K. Ohmi, Y. Ohnishi, M. Tobiyama, R. Ueki
    KEK, Ibaraki, Japan
 
  In the Low Energy Ring (LER) for positrons in the SuperKEKB, a vertical beam size blow-up was observed when the bunch current was approximately 1 mA. If a beam size blow-up occurs, the design luminosity cannot be achieved. Therefore, beam size blow-ups must be pre-vented. According to calculations, the bunch current threshold of the Transverse Mode Coupling instability (TMCI) is 2 mA or more, and the observed value is 50% or smaller. This vertical beam size blow-up cannot be explained by ordinary TMCI. This paper shows that by analyzing factors such as beam oscillation, the cause of the vertical beam size blow-up was determined. The study results showed that the vertical beam size blow-up in the LER was caused by the oscillations of the -1 mode.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2022-WEPOTK050  
About • Received ※ 17 May 2022 — Accepted ※ 22 June 2022 — Issue date ※ 25 June 2022  
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)