MOPOST021 ReAccelerator Upgrade, Commissioning and First Experiments at the National Superconducting Cyclotron Laboratory (NSCL) / Facility for Rare Isotope Beams (FRIB) 101
 
  • A.C.C. Villari, G. Bollen, K.D. Davidson, K. Fukushima, A.I. Henriques, K. Holland, S.H. Kim, A. Lapierre, T. Maruta, D.G. Morris, S. Nash, P.N. Ostroumov, A.S. Plastun, J. Priller, B.M. Sherrill, R. Walker, T. Zhang, Q. Zhao
    FRIB, East Lansing, Michigan, USA
  • B. Arend, D.B. Crisp, D.J. Morrissey, M. Steiner
    NSCL, East Lansing, Michigan, USA
 
  Funding: Work supported by the NSF under grant PHY15-65546 and DOE-SC under award number DE-SC0000661
The reaccelerator ReA is a state-of-the-art super-conducting linac for reaccelerating rare isotope beams produced via inflight fragmentation or fission and subse-quent beam stopping. ReA was subject of an upgrade that increased its final beam energy from 3 MeV/u to 6 MeV/u for ions with charge over mass equal to 1/4. The upgrade included a new room-temperature rebuncher after the first section of acceleration, a new β = 0.085 QWR cryomodule and two new beamlines in a new ex-perimental vault. During commissioning, beams were accelerated with near 100 percent transport efficiency through the linac and delivered through beam transport lines. Measured beam characteristics match those calcu-lated. Following commissioning, stable and long living rare isotope beams from a Batch Mode Ion Source (BMIS) were accelerated and delivered to experiments. This con-tribution will briefly describe the upgrade, and results from beam commissioning and beam delivery for experi-ments.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2022-MOPOST021  
About • Received ※ 07 June 2022 — Revised ※ 12 June 2022 — Accepted ※ 17 June 2022 — Issue date ※ 21 June 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)