Author: Miura, T.
Paper Title Page
THPOST011 SuperKEKB Electron Positron Injector Linac Upgrade for Higher Charge and Lower Emittance 2461
 
  • K. Furukawa, H. Ego, Y. Enomoto, N. Iida, T. Kamitani, M. Kawamura, S. Matsumoto, T. Matsumoto, T. Miura, M. Satoh, A. Shirakawa, T. Suwada, M. Yoshida
    KEK, Ibaraki, Japan
 
  KEK electron positron injector linac has established simultaneous top-up injections in 2019 for 5 rings of SuperKEKB DR, LER, HER, PF ring and PF-AR as a base of the both elementary particle physics and photon science experiments even under a quite short beam lifetime. It improved the injection stabilities while the SuperKEKB broke the world record of the collision luminosity of the previous project KEKB. As the collision performance improves, the beam-beam effect makes the dynamic aperture shrink, and the beam lifetime reduces further. Thus, it became inevitable for the injector to be upgraded in order to resolve the contradictory improvements of higher charge and lower emittance of injection beams regarding beam wakefield till 2025. The upgrade plan is described including pulsed magnets, an energy compression system, accelerating structures, girders, positron generator and so on.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2022-THPOST011  
About • Received ※ 07 June 2022 — Revised ※ 16 June 2022 — Accepted ※ 16 June 2022 — Issue date ※ 17 June 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPOST012 Achievement of 200, 000 Hours of Operation at KEK 7-GeV Electron 4-GeV Positron Injector Linac 2465
 
  • K. Furukawa, M. Akemoto, D.A. Arakawa, Y. Arakida, H. Ego, Y. Enomoto, T. Higo, H. Honma, N. Iida, K. Kakihara, T. Kamitani, H. Katagiri, M. Kawamura, S. Matsumoto, T. Matsumoto, H. Matsushita, K. Mikawa, T. Miura, F. Miyahara, H. Nakajima, T. Natsui, Y. Ogawa, S. Ohsawa, Y. Okayasu, T. Oogoe, M.A. Rehman, I. Satake, M. Satoh, Y. Seimiya, T. Shidara, A. Shirakawa, H. Someya, T. Suwada, M. Tanaka, D. Wang, Y. Yano, K. Yokoyama, M. Yoshida, T. Yoshimoto, R. Zhang, X. Zhou
    KEK, Ibaraki, Japan
  • Y. Bando
    Sokendai, Ibaraki, Japan
 
  KEK electron positron injector linac initiated the injection operation into Photon Factory (PF) light source in 1982. Since then for 39 years, it has served for multiple projects, namely, TRISTAN, PF-AR, KEKB, and SuperKEKB. Its total operation time has accumulated 200 thousand hours on May 7, 2020. We are extremely proud of the achievement following continuous efforts by our seniors. The construction of the injector linac started in 1978, and it was commissioned for PF with 2.5 GeV electron in 1982. In parallel, the positron generator linac was constructed for the TRISTAN collider project. The slow positron facility was also commissioned in 1992. After the KEKB asymmetric-energy collider project was commissioned in 1998 with direct energy injections, the techniques such as two-bunch acceleration and simultaneous injection were developed. As the soft structure design of the linac was too weak against the great east Japan earthquake, it took three years to recover. Then the construction and commissioning for the SuperKEKB project went on, and the simultaneous top-up injection into four storage rings contributes to the both elementary particle physics and photon science.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2022-THPOST012  
About • Received ※ 20 May 2022 — Revised ※ 15 June 2022 — Accepted ※ 16 June 2022 — Issue date ※ 08 July 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)