Paper |
Title |
Page |
MOPOMS042 |
Comparison Between Run 2 TID Measurements and FLUKA Simulations in the CERN LHC Tunnel of the Atlas Insertion Region |
732 |
|
- D. Prelipcean, K. Biłko, F. Cerutti, A. Ciccotelli, D. Di Francesca, R. García Alía, B. Humann, G. Lerner, D. Ricci, M. Sabaté-Gilarte
CERN, Meyrin, Switzerland
- B. Humann
TU Vienna, Wien, Austria
|
|
|
In this paper we present a systematic benchmark between the simulated and the measured data for the radiation monitors useful for Radiation to Electronics (R2E) studies at the Large Hadron Collider (LHC) at CERN. For this purpose, the radiation levels in the main LHC tunnel on the right side of the Interaction Point 1 (ATLAS detector) are simulated using the FLUKA Monte Carlo code and compared against Total Ionising Dose (TID) measurements performed with the Beam Loss Monitoring (BLM) system, and 180 m of Distributed Optical Fibre Radiation Sensor (DOFRS). Considering the complexity and the scale of the simulations as well as the variety of the LHC operational parameters, we find a generally good agreement between measured and simulated radiation levels, typically within a factor of 2 or better.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2022-MOPOMS042
|
|
About • |
Received ※ 08 June 2022 — Revised ※ 23 June 2022 — Accepted ※ 26 June 2022 — Issue date ※ 09 July 2022 |
Cite • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
MOPOMS044 |
Implications and Mitigation of Radiation Effects on the CERN SPS Operation during 2021 |
740 |
|
- Y.Q. Aguiar, A. Apollonio, K. Biłko, M. Brucoli, M. Cecchetto, S. Danzeca, R. García Alía, T. Ladzinski, G. Lerner, J.B. Potoine, A. Zimmaro
CERN, Meyrin, Switzerland
|
|
|
During the Long Shutdown 2 (LS2, 2019-2020), the CERN accelerator complex has undergone major upgrades, mainly in preparation for the High-Luminosity (HL) LHC era, the ultimate capacity for its physics production. Therefore, several novel equipment and systems were designed and deployed throughout the accelerator complex. To comply with the radiation level specifications and avoid machine downtime due to radiation effects, the electronics systems exposed to radiation need to follow Radiation Hardness Assurance (RHA) methodologies developed and validated by the Radiation to Electronics (R2E) project at CERN. However, the establishment of such procedures is not yet fully implemented in the LHC injector chain, and some R2E failures were detected in the SPS during the 2021 operation. This work is devoted to describing and analysing the R2E failures and their impact on operation, in the context of the related radiation levels and equipment sensitivity.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2022-MOPOMS044
|
|
About • |
Received ※ 07 June 2022 — Revised ※ 21 June 2022 — Accepted ※ 26 June 2022 — Issue date ※ 08 July 2022 |
Cite • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
WEPOST001 |
Radiation Load Studies for Superconducting Dipole Magnets in a 10 TeV Muon Collider |
1671 |
|
- D. Calzolari, C. Carli, B. Humann, A. Lechner, G. Lerner, F. Salvat Pujol, D. Schulte, K. Skoufaris
CERN, Meyrin, Switzerland
- B. Humann
TU Vienna, Wien, Austria
|
|
|
Among the various future lepton colliders under study, muon colliders offer the prospect of reaching the highest collision energies. Despite the promising potential of a multi-TeV muon collider, the short lifetime of muons poses a severe technological challenge for the collider design. In particular, the copious production of decay electrons and positrons along the collider ring requires the integration of continuous radiation absorbers inside superconducting magnets. The absorbers are needed to avoid quenches, reduce the heat dissipation in the cold mass and prevent magnet failures due to long-term radiation damage. In this paper, we present FLUKA shower simulations assessing the shielding requirements for high-field magnets of a 10 TeV muon collider. We quantify in particular the role of synchrotron photon emission by decay electrons and positrons, which helps in dispersing the energy carried by the decay products. For comparison, selected results for a 3 TeV muon collider are also presented.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2022-WEPOST001
|
|
About • |
Received ※ 08 June 2022 — Revised ※ 11 June 2022 — Accepted ※ 14 June 2022 — Issue date ※ 16 June 2022 |
Cite • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
WEPOST012 |
Feasibility of Slow-Extracted High-Energy Ions From the CERN Proton Synchrotron for CHARM |
1703 |
|
- M.A. Fraser, P.A. Arrutia Sota, K. Biłko, N. Charitonidis, S. Danzeca, M. Delrieux, M. Duraffourg, N. Emriskova, L.S. Esposito, R. García Alía, A. Guerrero, O. Hans, G.I. Imesch, E.P. Johnson, G. Lerner, I. Ortega Ruiz, G. Pezzullo, D. Prelipcean, F. Ravotti, F. Roncarolo, A. Waets
CERN, Meyrin, Switzerland
|
|
|
The CHARM High-energy Ions for Micro Electronics Reliability Assurance (CHIMERA) working group at CERN is investigating the feasibility of delivering high energy ion beams to the CHARM facility for the study of radiation effects to electronics components engineered to operate in harsh radiation environments, such as space or high-energy accelerators. The Proton Synchrotron has the potential of delivering the required high energy and high-Z (in this case, Pb) ions for radiation tests over the relevant range of Linear Energy Transfer of ~ 10 - 40 MeV cm2/mg with a > 1 mm penetration depth in silicon, specifically for single event effect tests. This contribution summarises the working group’s progress in demonstrating the feasibility of variable energy slow extraction and over a wide range of intensities. The results of a dedicated 6 GeV/u Pb ion beam test are reported to understand the performance limitations of the beam instrumentation systems needed to characterise the beam in CHARM.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2022-WEPOST012
|
|
About • |
Received ※ 02 June 2022 — Revised ※ 14 June 2022 — Accepted ※ 15 June 2022 — Issue date ※ 23 June 2022 |
Cite • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|