Author: Laface, E.
Paper Title Page
TUPOTK027 Field Emission Measurements at Lund Test Stand 1265
 
  • C.G. Maiano, N. Elias, E. Laface, P. Pierini, L. Sagliano, M.Y. Wang
    ESS, Lund, Sweden
  • E. Cenni
    CEA-IRFU, Gif-sur-Yvette, France
 
  We present here a description of field emission (FE) measurements set-up developed for elliptical cryomodules test activities at Lund Test Stand 2. A test campaign of field emission measurements has been developed and optimized during cryomodules tests. The scintillator detectors (and their respective shields), chosen for these measurements, have been characterized and optimized. The field emission application has been developed and integrated in the cryomodules tests operator interface. The Initial test results are presented and commented.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2022-TUPOTK027  
About • Received ※ 07 June 2022 — Revised ※ 13 June 2022 — Accepted ※ 16 June 2022 — Issue date ※ 10 July 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPOTK028 Tuning of Superconducting Cavities Using the FFT of Transmitted Power 1268
 
  • E. Laface, C.G. Maiano, P. Pierini, M.Y. Wang
    ESS, Lund, Sweden
 
  We implemented a method to tune the ESS superconducting cavities based on the spectral analysis of the high resolution data available from the Low Level RF system (LLRF) for the transmitted power, without the need of connecting a network analyzer or any other dedicated instrumentation along the RF chain. A frequency peak up to 4 MHz off from the resonating frequency can be detected and used to control the stepper motor of the tuner until the cavity is stretched to the proper length to reach the correct operation frequency. Experience of its use at the ESS Test Stand 2 (TS2) facility at Lund during cryomodule acceptance testing is presented.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2022-TUPOTK028  
About • Received ※ 16 May 2022 — Revised ※ 11 June 2022 — Accepted ※ 13 June 2022 — Issue date ※ 14 June 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPOTK029 Open XAL Status Report 2022 1271
 
  • A.P. Zhukov, A.M. Hoover, A.P. Shishlo
    ORNL, Oak Ridge, Tennessee, USA
  • J.F. Esteban Müller, E. Laface, Y. Levinsen, N. Milas
    ESS, Lund, Sweden
 
  The Open XAL accelerator physics software platform has been developed through international collaboration among several facilities since 2010. The goal of the collaboration is to establish Open XAL as a multi-purpose software platform supporting a broad range of tool and application development in accelerator physics and high-level control (Open XAL also ships with a suite of general-purpose accelerator applications). This paper discusses progress in beam dynamics simulation and updated application framework along with new generic accelerator physics applications. We present the status of the project at each participating facility and a roadmap for continued development.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2022-TUPOTK029  
About • Received ※ 09 June 2022 — Revised ※ 13 June 2022 — Accepted ※ 16 June 2022 — Issue date ※ 29 June 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPOTK030 X-Rays Energy Measurements During the RFQ Conditioning at the European Spallation Source 1275
 
  • E. Laface, C.G. Maiano, R. Zeng
    ESS, Lund, Sweden
  • O. Piquet
    CEA-DRF-IRFU, France
 
  The Radio Frequency Quadrupole (RFQ) was conditioned at the European Spallation Source during spring 2021. We used part of the conditioning time to estimate the accelerating potential within the RFQ analyzing the x-rays bremsstrahlung radiation emitted by the electrons released and accelerated in the RFQ. The results of these measurements are in good agreement with the theoretical prediction.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2022-TUPOTK030  
About • Received ※ 16 May 2022 — Revised ※ 13 June 2022 — Accepted ※ 14 June 2022 — Issue date ※ 27 June 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPOTK001 Status of the Normal Conducting Linac at the European Spallation Source 2019
 
  • D.C. Plostinar, C. Amstutz, S. Armanet, R.A. Baron, E.C. Bergman, A.K. Bhattacharyya, B.E. Bolling, W. Borg, S. Calic, M. Carroll, J. Cereijo García, J. Christensson, J.D. Christie, H. Danared, C.S. Derrez, E.M. Donegani, S. Ekström, M. Eriksson, M. Eshraqi, J.F. Esteban Müller, K. Falkland, M.J. Ferreira, A. Forsat, S. Gabourin, A.A. Gorzawski, V. Grishin, P.O. Gustavsson, S. Haghtalab, V.A. Harahap, H. Hassanzadegan, W. Hees, J.J. Jamróz, A. Jansson, M. Jensen, B. Jones, M. Kalafatic, I. Kittelmann, H. Kocevar, S. Kövecses de Carvalho, E. Laface, B. Lagoguez, Y. Levinsen, M. Lindroos, A. Lundmark, M. Mansouri, C. Marrelli, C.A. Martins, J.P.S. Martins, S. Micic, N. Milas, R. Miyamoto, M. Mohammednezhad, R. Montaño, M. Muñoz, G. Mörk, D.J.P. Nicosia, B. Nilsson, D. Noll, A. Nordt, T. Olsson, L. Page, D. Paulic, S. Pavinato, S. Payandeh Azad, A. Petrushenko, J. Riegert, A. Rizzo, K.E. Rosengren, K. Rosquist, M. Serluca, T.J. Shea, A. Simelio, S. Slettebak, A.G. Sosa, H. Spoelstra, A.M. Svensson, L. Svensson, R. Tarkeshian, L. Tchelidze, C.A. Thomas, E. Trachanas, K. Vestin, R. Zeng, P.L. van Velze, N. Öst
    ESS, Lund, Sweden
  • L. Antoniazzi, C. Baltador, L. Bellan, M. Comunian, E. Fagotti, L. Ferrari, M.G. Giacchini, F. Grespan, M. Montis, A. Palmieri, A. Pisent, D. Scarpa
    INFN/LNL, Legnaro (PD), Italy
  • T. Bencivenga, P. Mereu, C. Mingioni, M. Nenni, E. Nicoletti
    INFN-Torino, Torino, Italy
  • I. Bustinduy, A. Conde, D. Fernández-Cañoto, N. Garmendia, P.J. González, G. Harper, A. Kaftoosian, J. Martin, I. Mazkiaran, J.L. Muñoz, A.R. Páramo, S. Varnasseri, A.Z. Zugazaga
    ESS Bilbao, Derio, Spain
  • A.C. Chauveau, P. Hamel, O. Piquet
    CEA-IRFU, Gif-sur-Yvette, France
  • L. Neri
    INFN/LNS, Catania, Italy
 
  The construction of the ESS accelerator is in full swing. Many key components have been delivered from our in-kind partners and installation, testing and commissioning is making remarkable progress. The first machine section to be commissioned with beam is the Normal Conducting Linac (NCL). When completed, a 14 Hz, 2.86 ms proton beam up to 62.5 mA will be transported from the Ion Source, through the Low Energy Beam Transport (LEBT) line, the Radiofrequency Quadrupole (RFQ), the Medium Energy Beam Transport (MEBT) line and the five Drift Tube Linac (DTL) tanks up to 90 MeV where it will be injected in the first superconducting module of the machine. This paper will highlight recent progress across the NCL, present briefly the first commissioning results and discuss the upcoming phases as well as challenges in delivering a machine capable of meeting the requirements for a next generation spallation neutron facility.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2022-WEPOTK001  
About • Received ※ 13 June 2022 — Accepted ※ 15 June 2022 — Issue date ※ 02 July 2022  
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)