Author: Kim, D.M.
Paper Title Page
THOXGD3 Commissioning Status of the RAON Superconducting Accelerator 2399
 
  • H.J. Kim, Y.J. Choi, Y.S. Chung, J. Heo, I.S. Hong, J.-H. Jang, D. Jeon, H. Jin, G.D. Kim, Y.H. Kim, J.W. Kwon, S. Lee, B.-S. Park, M.J. Park, C.W. Son
    IBS, Daejeon, Republic of Korea
  • D.M. Kim
    KUS, Sejong, Republic of Korea
  • E.H. Lim
    Korea University Sejong Campus, Sejong, Republic of Korea
  • S.H. Moon
    UNIST, Ulsan, Republic of Korea
 
  The Rare isotope Accelerator Complex for ON-line experiments (RAON) has been proposed as a multi-purpose accelerator facility for providing beams of exotic rare isotopes of various energies. It can deliver ions from hydrogen (proton) to uranium. Protons and uranium ions are accelerated up to 600 MeV and 200 MeV/u respectively. It can provide various rare isotope beams which are produced by isotope separator on-line system. The RAON injector was successfully commissioned in 2021 to study the initial beam parameters from the main technical systems, such as the ECR ion source and RFQ, and to find the optimized LEBT and MEBT setpoints and matching conditions. In this paper, we present the current commissioning status of the RAON injector in preparation for the upcoming SCL3 beam commissioning.  
slides icon Slides THOXGD3 [6.508 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2022-THOXGD3  
About • Received ※ 08 June 2022 — Revised ※ 12 June 2022 — Accepted ※ 14 June 2022 — Issue date ※ 15 June 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)