Author: Jones, J.K.
Paper Title Page
THPOPT015 The Design of the Full Energy Beam Exploitation (FEBE) Beamline on CLARA 2594
 
  • A.R. Bainbridge, D. Angal-Kalinin, J.K. Jones, T.H. Pacey, Y.M. Saveliev, E.W. Snedden
    STFC/DL/ASTeC, Daresbury, Warrington, Cheshire, United Kingdom
 
  The CLARA facility at Daresbury Laboratory was orig-inally designed for the study of novel FEL physics utilis-ing high-quality electron bunches at up to 250 MeV/c. To maximise the exploitation of the accelerator complex, a dedicated full energy beam exploitation (FEBE) beam-line has been designed and is currently being installed in a separate vault on the CLARA accelerator. FEBE will allow the use of high charge (up to 250 pC), moderate energy (up to 250 MeV), electron bunches for a wide variety of accelerator applications critical to ongoing accelerator development in the UK and international communities. The facility consists of a shielded enclo-sure, accessible during beam running in CLARA, with two very large experimental chambers compatible with a wide range of experimental proposals. High-power laser beams (up to 100 TW) will be available for electron-beam interactions in the first chamber, and there are concrete plans for a wide variety of advanced diagnostics (includ-ing a high-field permanent magnet spectrometer and dielectric longitudinal streaker), essential for multiple experimental paradigms, in the second chamber. FEBE will be commissioned in 2024.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2022-THPOPT015  
About • Received ※ 08 June 2022 — Revised ※ 13 June 2022 — Accepted ※ 16 June 2022 — Issue date ※ 01 July 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPOPT049 Beam Dynamics Studies for the Diamond-II Injector 2708
 
  • I.P.S. Martin, R.T. Fielder, J. Kallestrup, T. Olsson, B. Singh
    DLS, Oxfordshire, United Kingdom
  • J.K. Jones, B.D. Muratori
    STFC/DL/ASTeC, Daresbury, Warrington, Cheshire, United Kingdom
 
  The replacement, low-emittance booster for the Diamond-II project will have a racetrack structure of 36 units cells constructed from alternating focussing and defocussing combined-function dipoles*. In this paper we report on how the design and performance characterisation of the booster has recently developed; this includes an increase in the injection energy from 100 to 150 MeV, a modified circumference to match to the storage ring RF frequency, and a new nominal tune-point to improve the performance and enable emittance exchange. The influence of the vacuum chamber impedance and intra-beam scattering on the electron bunch parameters during the ramp are presented, along with the necessary changes to the transfer line layouts.
*I.P.S. Martin, et al. "Progress with the Booster Design for the Diamond-II Upgrade", in Proc. IPAC’21, paper ID MOPAB071, Campinas, Brazil, May 2021
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2022-THPOPT049  
About • Received ※ 07 June 2022 — Revised ※ 15 June 2022 — Accepted ※ 15 June 2022 — Issue date ※ 29 June 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)