WEPOPT055 Linac3, LEIR and PS Performance with Ions in 2021 and Prospects for 2022 1983
 
  • N. Biancacci, S.C.P. Albright, R. Alemany-Fernández, D. Alves, M.E. Angoletta, D. Barrientos, H. Bartosik, G. Bellodi, S.B. Bertolo, D. Bodart, M. Bozzolan, H. Damerau, F.D.L. Di Lorenzo, A. Frassier, D. Gamba, A. Huschauer, S. Jensen, V. Kain, T. Koevener, G. Kotzian, D. Küchler, A. Lasheen, G. Le Godec, T.E. Levens, N. Madysa, E. Mahner, O. Marqversen, C.M. Mastrostefano, P.D. Meruga, C. Mutin, M. O’Neil, G. Piccinini, R. Scrivens, P.S. Solvang, D. Valuch, F.M. Velotti, R. Wegner, C. Wetton, M. Zampetakis
    CERN, Meyrin, Switzerland
 
  CERN accelerators underwent a period of long shutdown from the end of 2018 to 2020. During this time frame, significant hardware and software upgrades have been put in place to increase the performance of both proton and ion accelerator chains in the High Luminosity LHC era. In the context of the CERN lead ion chain, 2021 has been mainly devoted to restore the injectors’ performance and to successfully prove the slip-stacking technique in SPS. In this paper we summarise the key milestones of the ion beam commissioning and the achieved beam performance for the Linac 3 (including the source), LEIR and PS accelerators, together with an outlook on 2022 operation.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2022-WEPOPT055  
About • Received ※ 03 June 2022 — Revised ※ 12 June 2022 — Accepted ※ 16 June 2022 — Issue date ※ 17 June 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPOTK043 Matching Studies Between the CERN PSB and PS Using Turn-by-Turn Beam Profile Acquisitions with a Residual Beam Gas Ionisation Monitor 2161
 
  • M.A. Fraser, M.R. Coly, A. Guerrero, A. Huschauer, S. Jensen, S. Levasseur, F. Roncarolo, A. Rossi, H.S. Sandberg, J.W. Storey
    CERN, Meyrin, Switzerland
 
  In the framework of the LHC Injectors Upgrade project, the Beam Gas Ionisation (BGI) profile monitors installed in the Proton Synchrotron (PS) were fitted with a gas injection system capable of boosting the signal rate high enough to capture single turn acquisitions immediately after injection. This contribution reports on the studies carried out during the beam commissioning of the BGI system in a turn-by-turn matching monitor mode for its eventual implementation in an optimisation framework to preserve emittance during transfer between the PS Booster and PS. The BGI commissioning included a benchmarking with data from a wire-grid secondary emission monitor inserted into the circulating beam.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2022-WEPOTK043  
About • Received ※ 02 June 2022 — Accepted ※ 22 June 2022 — Issue date ※ 30 June 2022  
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)