Paper | Title | Page |
---|---|---|
TUPOPT037 | LCLS Multi-Bunch Improvement Plan: First Results | 1092 |
|
||
LCLS copper linac primarily operates in a single bunch mode with a repetition rate of 120 Hz. Presently, several in-house projects and LCLS user experiments require double- and multi-pulse trains of X-rays, with inter-pulse delay spanning between 0.35 and 220 ns. We discuss beam control improvements to the copper linac using ultra-fast stripline kicker, as well as additional photon diagnostics. We especially focus on a case of double-pulse mode, with 218 ns separation. | ||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2022-TUPOPT037 | |
About • | Received ※ 12 June 2022 — Revised ※ 13 June 2022 — Accepted ※ 17 June 2022 — Issue date ※ 10 July 2022 | |
Cite • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |