MOPOST006 Beam Commissioning and Optimisation in the CERN Proton Synchrotron After the Upgrade of the LHC Injectors 54
 
  • A. Huschauer, M.R. Coly, D.G. Cotte, H. Damerau, M. Delrieux, J.-C. Dumont, Y. Dutheil, S.E.R. Easton, M.A. Fraser, O. Hans, G.I. Imesch, S. Joly, A. Lasheen, C.L. Lombard, R. Maillet, B. Mikulec, J.-M. Nonglaton, S. Sainz Perez, B. Salvant, R. Suykerbuyk, F. Tecker, R. Valera Teruel
    CERN, Meyrin, Switzerland
 
  The CERN LHC injector chain underwent a major upgrade during the Long Shutdown 2 (LS2) in the framework of the LHC Injectors Upgrade (LIU) project. After 2 years of installation work, the Proton Synchrotron (PS) was restarted in 2021 with the goal to achieve pre-LS2 beam quality by the end of 2021. This contribution details the main beam commissioning milestones, encountered difficulties and lessons learned. The status of the fixed-target and LHC beams will be given and improvements in terms of performance, controls and tools described.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2022-MOPOST006  
About • Received ※ 01 June 2022 — Revised ※ 14 June 2022 — Accepted ※ 15 June 2022 — Issue date ※ 02 July 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPOTK043 Matching Studies Between the CERN PSB and PS Using Turn-by-Turn Beam Profile Acquisitions with a Residual Beam Gas Ionisation Monitor 2161
 
  • M.A. Fraser, M.R. Coly, A. Guerrero, A. Huschauer, S. Jensen, S. Levasseur, F. Roncarolo, A. Rossi, H.S. Sandberg, J.W. Storey
    CERN, Meyrin, Switzerland
 
  In the framework of the LHC Injectors Upgrade project, the Beam Gas Ionisation (BGI) profile monitors installed in the Proton Synchrotron (PS) were fitted with a gas injection system capable of boosting the signal rate high enough to capture single turn acquisitions immediately after injection. This contribution reports on the studies carried out during the beam commissioning of the BGI system in a turn-by-turn matching monitor mode for its eventual implementation in an optimisation framework to preserve emittance during transfer between the PS Booster and PS. The BGI commissioning included a benchmarking with data from a wire-grid secondary emission monitor inserted into the circulating beam.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2022-WEPOTK043  