Author: Burandt, C.
Paper Title Page
MOPOST015 Beam Dynamics Simulations for the Superconducting HELIAC CW Linac at GSI 86
 
  • M. Schwarz, T. Conrad, H. Podlech
    IAP, Frankfurt am Main, Germany
  • K. Aulenbacher, F.D. Dziuba, S. Lauber, J. List
    IKP, Mainz, Germany
  • K. Aulenbacher, W.A. Barth, M. Basten, C. Burandt, F.D. Dziuba, V. Gettmann, T. Kürzeder, S. Lauber, J. List, M. Miski-Oglu, S. Yaramyshev
    HIM, Mainz, Germany
  • K. Aulenbacher, W.A. Barth, M. Basten, C. Burandt, F.D. Dziuba, V. Gettmann, M. Heilmann, T. Kürzeder, S. Lauber, J. List, M. Miski-Oglu, A. Rubin, S. Yaramyshev
    GSI, Darmstadt, Germany
  • W.A. Barth
    KPH, Mainz, Germany
  • H. Podlech
    HFHF, Frankfurt am Main, Germany
 
  Funding: Work supported by the German Federal Ministry of Education and Research (BMBF, contract no. 05P21RFRB2)
The superconducting (SC) continuous wave (CW) heavy ion linac HELIAC (HElm\-holtz LInear ACcelerator) is a common project of GSI and HIM under key support of IAP Frankfurt. It is intended for future experiments with heavy ions near the Coulomb barrier within super-heavy element (SHE) research and aims at developing a linac with multiple CH cavities as key components downstream the High Charge State Injector (HLI) at GSI. The design is challenging due to the requirement of intense beams in CW mode up to a mass-to-charge ratio of 6, while covering a broad output energy range from 3.5 to 7.3 MeV/u with minimum energy spread. In 2017 the first superconducting cavity of the linac has been successfully commissioned and extensively tested with beam at GSI. In the light of experience gained in this research so far, the beam dynamics layout for the entire linac has been updated and optimized in the meantime. This contribution will provide a brief overview of the recent progress on the project, as well as a potential modification to the linac layout.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2022-MOPOST015  
About • Received ※ 08 June 2022 — Revised ※ 09 June 2022 — Accepted ※ 03 July 2022 — Issue date ※ 10 July 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPOMS041 High Power RF-Cavity Development for the HBS-Driver LINAC 1516
 
  • M. Basten, K. Aulenbacher, W.A. Barth, C. Burandt, F.D. Dziuba, V. Gettmann, T. Kürzeder, S. Lauber, J. List, M. Miski-Oglu, M. Vossberg, S. Yaramyshev
    GSI, Darmstadt, Germany
  • K. Aulenbacher, W.A. Barth, M. Basten, C. Burandt, F.D. Dziuba, V. Gettmann, T. Kürzeder, S. Lauber, J. List, M. Miski-Oglu
    HIM, Mainz, Germany
  • K. Aulenbacher, W.A. Barth, F.D. Dziuba, S. Lauber, J. List
    KPH, Mainz, Germany
  • T. Gutberlet
    JCNS, Jülich, Germany
  • H. Podlech
    IAP, Frankfurt am Main, Germany
  • H. Podlech
    HFHF, Frankfurt am Main, Germany
 
  Neutron research in Europe is mainly based on various nuclear reactors that will be successively decommissioned over the next years. This means that despite the commissioning of the European Spallation Source ESS, many neutron research centres, especially in the medium flux regime, will disappear. In response to this situation, the Jülich Centre for Neutron Science (JCNS) has begun the development of a scalable, compact, accelerator-based High Brilliance neutron Source (HBS). A total of three different neutron target stations are planned, which can be operated with a 100 mA proton beam of up to 70 MeV and a duty cycle of up to 6%. The driver Linac consists of an Electron Cyclotron Resonance (ECR) ion source followed by a LEBT section, a 2.5 MeV double Radio-Frequency Quadrupole (RFQ) and 35 normal conducting (NC) Crossbar H-Mode (CH) cavities. The development of the cavities is carried out by the Institute for Applied Physics (IAP) at the Goethe University Frankfurt am Main. Due to the high beam current, all cavities as well as the associated tuners and couplers have to be optimised for operation under high thermal load to ensure safe operation. In collaboration with the GSI Centre for Heavy Ion Research as the ideal test facility for high power tests, two cavities and the associated hardware are being designed and will be tested. The design and latest status of both cavities will be presented in this paper.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2022-TUPOMS041  
About • Received ※ 18 May 2022 — Revised ※ 15 June 2022 — Accepted ※ 28 June 2022 — Issue date ※ 06 July 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)