JACoW logo

Journals of Accelerator Conferences Website (JACoW)

JACoW is a publisher in Geneva, Switzerland that publishes the proceedings of accelerator conferences held around the world by an international collaboration of editors.


RIS citation export for THOYSP2: The New Eddy Current Type Septum Magnet for Upgrading of Fast Extraction in Main Ring of J-PARC

TY  - CONF
AU  - Shibata, T.
AU  - Fan, K.
AU  - Ishii, K.
AU  - Iwata, S.
AU  - Matsumoto, H.
AU  - Sugimoto, T.
ED  - Zimmermann, Frank
ED  - Tanaka, Hitoshi
ED  - Sudmuang, Porntip
ED  - Klysubun, Prapong
ED  - Sunwong, Prapaiwan
ED  - Chanwattana, Thakonwat
ED  - Petit-Jean-Genaz, Christine
ED  - Schaa, Volker R.W.
TI  - The New Eddy Current Type Septum Magnet for Upgrading of Fast Extraction in Main Ring of J-PARC
J2  - Proc. of IPAC2022, Bangkok, Thailand, 12-17 June 2022
CY  - Bangkok, Thailand
T2  - International Particle Accelerator Conference
T3  - 13
LA  - english
AB  - For our first goal of the beam power of Main Ring for Fast eXtraction (FX), 750 kW, we have been evaluating a new Low-Field FX Septum magnets which are induced eddy current type (Eddy-Septum) since 2014. The pending technical issues are disagreement in two current monitor systems and the long switching time of the Main-charger to Sub-charger at low charging voltage. We measured a gap field during measurement of current, and found no drift in time variation of gap field. Our conclusion was that the cause of the disagreement is electric and radiative noise which make the drift in the time variation. The long-term stability of the output pulsed current depends on the switching time and charging voltage. We investigated the correlation between the keeping time of flat-top charging voltage and long-time stability with various charging voltages. In June 2021, we have first conducted the 1 Hz operation and high-voltage test of the Eddy-Septum which is mounted in a vacuum chamber, and we found no problem. A new pure iron duct type magnetic shield for reducing the leakage field were produced in July 2021. The new LF FX-Septum will be installed in MR in early of 2022.
PB  - JACoW Publishing
CP  - Geneva, Switzerland
SP  - 2428
EP  - 2431
KW  - septum
KW  - extraction
KW  - operation
KW  - power-supply
KW  - injection
DA  - 2022/07
PY  - 2022
SN  - 2673-5490
SN  - 978-3-95450-227-1
DO  - doi:10.18429/JACoW-IPAC2022-THOYSP2
UR  - https://jacow.org/ipac2022/papers/thoysp2.pdf
ER  -